Engineering support in the development of project documentation for the facilities of the Zashulansky coal deposit, Zabaikalsky Krai, 2021
Scope of work performed:
A full range of engineering support for the objects of the external transport infrastructure of the Zashulansky coal deposit - a 150 km highway and a railway station for loading and sending coal, cutting facilities (a box of dump trucks, sewage treatment plants, a shift camp, power supply facilities). In the process of work, the solutions proposed by the designers are considered. The objects of the highway are currently under examination. The rest of the objects are being audited. During the inspections, frequent mistakes of designers are revealed, ranging from inattention to serious design errors. For example, it was possible to eliminate irrational decisions on the construction of bridges with improper support design, optimize the delivery shoulder of inert and the height of the embankment of the highway.